Series 1. Media clippings. 1960-1987, undated.
Series Scope and Content Summary
Clippings from The Register, The Press-Enterprise, The Record, Daily Titan, People's World, West Side News, Ad-Vantage, The Los Angeles Times, and other publications regarding the Stringfellow Hazardous Waste Site (includes photocopies). 1960-1987, undated.
Clippings from The Press-Enterprise, Pacific Sun, Whole Life Times, the Los Angeles Times, Ad-Vantage, The Record, Time, articles and papers on toxic waste, and other publications regarding the Stringfellow Hazardous Waste Site (includes photocopies). Cassette tape regarding tire fire in Winchester, Virginia. 1965-1987, undated.
Clippings from The Press-Enterprise, Ad-vantage, The Record, The Register, the Los Angeles Times, The Sun, and other publications regarding the Stringfellow Hazardous Waste Site (includes photocopies). 1972-1987, undated.
Clippings from The Record, The Press-Enterprise, The Columbus Dispatch, The American City & County, and other publications regarding the Stringfellow Hazardous Waste Site (includes photocopies). 1972-1987, undated.
Series 2. Ruth Kirkby papers. 1951-2005, undated.
Series Scope and Content Summary
Ephemera, writings, presentation copies, samples of work, and other material regarding engineering, environmental, and waste management firms and programs. 1972-1987, undated.
Field notes, reports, proposals, evaluations, and work plans submitted to, or prepared by, the Santa Ana Regional Water Quality Control Board, U.S. Environmental Protection Agency, California Department of Health Services, Santa Ana Watershed Project Authority, U.S. Army Corps of Engineers, and other agencies. 1973-1986.
Reports, plans, and proposals submitted to, or prepared by, the U.S. Environmental Protection Agency, Region IX, U.S. Army Corps of Engineers, Santa Ana Regional Water Quality Control Board, Santa Ana Watershed Project Authority, California Department of Health Services, and other agencies. 1975-1987, undated.
Reports, plans, proposals, evaluations, and documents submitted to, or prepared by, the State Water Resources Control Board, Santa Ana Regional Water Quality Control Board, Santa Ana Watershed Project Authority, California Department of Health Services, and other agencies. 1973-1985.
Correspondence regarding Riverside law firm Macomber and Eley (includes photocopies). 1972-1977.
Correspondence, writings, presentation copies, samples of work, public records, and other material regarding engineering, environmental, and waste management firms and programs. 1974-1985, undated.
Correspondence, public records, reports, and other material regarding engineering, environmental, and waste management projects. circa 1969-1987, undated.
Reports and proposals submitted to, or prepared for, the Santa Ana Watershed Project Authority, California Department of Health Services, South Coast Air Quality Management District, and San Bernardino County Land Management Department, Environmental Public Works Agency. 1976-1987.
Technical reports, proposals, and publications prepared for the California Department of Health Services, Toxic Substances Control Division. 1983-1987.
Technical reports, proposals, and publications prepared for the California Department of Health Services, Toxic Substances Control Division, Santa Ana Regional Water Quality Control Board, and other entities. 1974-1989.
Public records regarding Stringfellow Quarry Company financial, legal, and business affairs in Riverside County (photocopies). 1972-1976, undated.
Technical reports, proposals, and publications submitted to, or prepared for, the Stringfellow Technical Committee and the California Department of Health Services. 1974-1985.
Correspondence, documents, ephemera, and other material regarding the United States Environmental Protection Agency, Region IX (includes photocopies). 1985-1987, undated.
Technical reports, correspondence, drafts, and other material regarding the United States Environmental Protection Agency, Region IX (includes photocopies). 1984-1985, undated.
Correspondence, publications, public records, transcripts, and other material regarding Representative George E. Brown, Jr.'s involvement with the Stringfellow Hazardous Waste Site (includes photocopies). 1972-1986, undated.
Correspondence, publications, clippings, and other material regarding the United States Environmental Protection Agency, Region IX, and the federal Superfund program. 1973-1985, undated.
Public records, correspondence, publications, and other material regarding various United States federal agencies (includes photocopies). 1962-1984.
Correspondence, publications, drafts, and other material regarding the California Department of Health Services (includes photocopies). 1973-1988, undated.
Correspondence, publications, and other material regarding California state legislators' involvement with the Stringfellow Hazardous Waste Site (includes photocopies). Legislators include Senator Robert Presley and Assemblyman Walter M. Ingalls. 1971-1987, undated.
Legal documents regarding cases held in the County of Riverside Superior Court (photocopies). Parties include the Jurupa Mountains Cultural Center, local and state public utility agencies, and classes of citizens. 1972-1987, undated.
Deposition of Ruth Kirkby from the legal case Penny Newman et al. vs. J.B. Stringfellow, Jr., et al.Case heard in the Superior Court of the State of California, County of Riverside. 1987-1988.
Correspondence, public records, and other material regarding the California Public Utilities Commission (includes photocopies). 1974-1977, undated.
Correspondence, public records, transcripts, and other material regarding the Santa Ana Regional Water Quality Control Board and the State Water Resources Control Board (includes photocopies). Public records regarding Stringfellow Quarry Company financial, legal, and business affairs in Riverside County (photocopies). 1955-1985, undated.
Correspondence, documents, reports, and other material regarding the Santa Ana Watershed Project Authority (includes photocopies). 1973-1985, undated.
Correspondence, reports, and other material regarding various California state agencies (includes photocopies). 1972-1984, undated.
Correspondence, public records, transcripts, and other material regarding the Riverside County Planning Commission (also called Department or Council; includes photocopies). 1955-1986, undated.
Correspondence, public records, agendas, minutes, and other material regarding Riverside County government agencies and community organizations (includes photocopies). 1969-1987, undated.
Drafts, minutes, documents, and other material regarding the Parents of Jurupa, Inc. (includes photocopies). 1972-1985, undated.
Public records, correspondence, minutes, rosters, and other material maintained by, or regarding, the Riverside County Solid Waste Management Advisory Committee and Class I Task Force of the County Road Department (includes photocopies). 1956-1977, undated.
Correspondence, public records, transcripts, maps, and other material regarding various Riverside County and City of Riverside government agencies (includes photocopies). 1955-1986, undated.
Correspondence, minutes, maps, and other material maintained by, or regarding, the Jurupa General Plan Steering Committee (includes photocopies). 1962-1973, undated.
Correspondence, notes, photographs, and other material sent from UCR geophysicist Donald J. Stierman, Ph.D., to Ruth Kirkby. 1979-1987, undated.
Ephemera, clippings, and other material regarding geological organizations and activities. 1976-1987, undated.
Agendas, minutes, correspondence, and other material regarding the Stringfellow Advisory Committee and Stringfellow EPA/DOHS Defendants' Technical Committee. 1983-1987, undated.
Correspondence, agendas, petitions, and other material regarding community groups and local public agencies of the Glen Avon, Jurupa, and Riverside areas (includes photocopies). Ephemera and clippings regarding pollution. 1970-1987, undated.
Correspondence, publications, and documents regarding California state and regional environmental regulatory agencies. 1972-1987, undated.
Transcript of an interview with Ruth Kirkby regarding the history of the Stringfellow Hazardous Waste Site and her political activism. Interview conducted by William Fuentes, Claims Adjuster for Liberty Mutual. 1985.
Correspondence, ephemera, writings, clippings, maps, and other material regarding engineering, environmental, and waste management firms and programs. circa 1972-1987, undated.
Deposition of Ruth Kirkby from the legal case Penny Newman et al. vs. J.B. Stringfellow, Jr., et al.Case heard in the Superior Court of the State of California, County of Riverside. 1987-1988.
Notes, fliers, and other material prepared or maintained by Ruth Kirkby, including typescripts, annotated typescripts, and photocopies. 1971-1986, undated.
Publications issued by the California Department of Natural Resources, Division of Mines and Geology, regarding the greater Southern California region. 1951, 1973.
Correspondence, notes, legal documents, and other material regarding the Jurupa Mountains Cultural Center (includes photocopies). circa 1970-1988, undated.
Map (hand-drawn; unidentified) of the Stringfellow area. undated.
Fliers, publications, ephemera, and other material regarding air resources and pollution in California. circa 1974-1983, undated.
Correspondence and plans regarding Science Applications International Corporation (SAIC). Documentation pertaining to the Stringfellow Hazardous Waste Site (photocopies). 1973-1987, undated.
Correspondence, ephemera, writings, clippings, maps, and other material regarding engineering, environmental, and waste management firms and programs, and geological organizations and activities. 1982-1987, undated.
Notes, documents, drafts, and other material prepared or maintained by Ruth Kirkby, including hand-written documents, typescripts, and annotated typescripts and clippings (includes photocopies). circa 1970-1988, undated.
Notes, documents, drafts, and other material prepared or maintained by Ruth Kirkby, including hand-written documents, typescripts, and annotated typescripts (includes photocopies). circa 1970-1988, undated.
Photographs (color; black and white) of the Stringfellow Hazardous Waste Site (source unknown). undated.
Correspondence, notes, legal documents, and other material regarding the Jurupa Mountains Cultural Center (includes photocopies). 1964-1978, undated.
Notes, documents, drafts, and other material prepared or maintained by Ruth Kirkby, including hand-written documents, typescripts, and annotated typescripts (includes photocopies). 1953-1974, undated.
Correspondence, public records, notes, reports, and other material regarding waste management in Southern California and the political activism of Glen Avon residents (includes photocopies). 1972-1987, undated.
Correspondence and documents sent from James A. Hammond, Ph.D., to Ruth Kirkby regarding the Stringfellow Hazardous Waste Site (includes photocopies). 1975-1983.
Public records, correspondence, clippings, drafts, and other material regarding the Santa Ana Regional Water Quality Control Board, the Stringfellow Quarry Company, Parents of Jurupa, Inc., and other entities (photocopies). 1955-circa 1983, undated.
Correspondence, notes, drafts, and fliers regarding waste management processes and solutions (includes photocopies). 1972-circa 1984, undated.
Clippings from the Los Angeles Times and The Press-Enterprise regarding a $93 million insurance settlement for cleanup of the Stringfellow Acid Pits. February 2, 2005.
Series 3. Technical reports. 1983-2009.
Series Scope and Content Summary
Sub-series 3.1 California Department of Health Services. Toxic Substances Control Division. 1984-1993.
Sub-series Scope and Content Summary
Feasibility study draft final reports:
Draft Final Report: Stringfellow Hazardous Waste Site Feasibility Study: Sections 1, 2, and 3. Prepared by Science Applications International Corporation for the California Department of Health Services, Toxic Substances Control Division. June 30, 1988.
Draft Final Report: Stringfellow Hazardous Waste Site Feasibility Study: Sections 4 and 5. Prepared by Science Applications International Corporation for the California Department of Health Services, Toxic Substances Control Division. June 30, 1988.
Draft Final Report: Stringfellow Hazardous Waste Site Feasibility Study: Appendix A. Prepared by Science Applications International Corporation for the California Department of Health Services, Toxic Substances Control Division. June 30, 1988.
Draft Final Report: Stringfellow Hazardous Waste Site Feasibility Study: Appendix B, C, D, E, and F. Prepared by Science Applications International Corporation for the California Department of Health Services, Toxic Substances Control Division. June 30, 1988.
Draft Final Report: Stringfellow Hazardous Waste Site Feasibility Study: Appendix G, H, and I. Prepared by Science Applications International Corporation for the California Department of Health Services, Toxic Substances Control Division. June 30, 1988.
Draft Final Report: Stringfellow Hazardous Waste Site Feasibility Study: Appendix J and K. Prepared by Science Applications International Corporation for the California Department of Health Services, Toxic Substances Control Division. June 30, 1988.
Glen Avon community:
"Attachment 1: Discussion of Cleanup of Contaminated Groundwater in Glen Avon South of Highway 60." circa 1988.
"DHS/EPA Proposed Plan for Contaminated Groundwater Cleanup South of Highway 60 in Glen Avon, California." Summary of joint agency recommendation by the California Department of Health Services, Toxic Substances Control Division, and the United States Environmental Protection Agency, Region IX. June 30, 1988.
Report on Radioactivity at the Stringfellow Site and in the Community of Glen Avon. Prepared by multiple agencies of the California Department of Health Services. circa 1985.
"Stringfellow Hazardous Waste Site Riverside County, California Community Relations Plan" (2 copies). March 16, 1993.
Stringfellow Health Effects Study: An Epidemiologic Health Survey of Residents of Glen Avon and Rubidoux, California (two copies). Prepared by the School of Public Health, University of California, Los Angeles, for the Epidemiological Studies Section, California State Department of Health Services, and the Riverside County Department of Health. February 1986.
Groundwater monitoring project:
"California Dept. of Health Services Toxic Task III: Routine Groundwater Monitoring Report, November 1986" (Revised Tables). April 27, 1987.
Final Summary Data Report: Stringfellow Groundwater Monitoring Project: Lower Pyrite Canyon Wells, July, 1989. Prepared for the California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Kleinfelder, Inc. December 1989.
Final Summary Data Report: Stringfellow Groundwater Monitoring Project: May and June 1989: Volume I. Prepared for the California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Kleinfelder, Inc. October 1989.
Final Summary Data Report: Stringfellow Groundwater Monitoring Project: May and June 1989: Volume II. Prepared for the California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Kleinfelder, Inc. October 1989.
Final Summary Data Report: Stringfellow Groundwater Monitoring Project: May and June 1989: Volume III. Prepared for the California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Kleinfelder, Inc. October 1989.
Final Summary Data Report: Stringfellow Groundwater Monitoring Project: May and June 1989: Volume IV. Prepared for the California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Kleinfelder, Inc. October 1989.
Stringfellow Site Routine Groundwater Monitoring: Isotopic Sampling Report. Prepared for the California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation. July 6, 1989.
Remedial investigation draft final reports:
Stringfellow Hazardous Waste Site Remedial Investigation: Draft Final Report Sections 1, 2, 3. Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation. June 1, 1987.
Stringfellow Hazardous Waste Site Remedial Investigation: Draft Final Report Sections 4, 5, 6, 7. Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation. June 1, 1987.
Stringfellow Hazardous Waste Site Remedial Investigation Draft Final Report: Appendix A (Site Maps). Prepared by Science Applications International Corporation for the California Department of Health Services Toxic Substances Control Division. June 1, 1987.
Stringfellow Hazardous Waste Site Remedial Investigation Draft Final Report: Appendix B and C (Methodologies and Geologic Logs). Prepared by Science Applications International Corporation for the California Department of Health Services Toxic Substances Control Division. June 1, 1987.
Stringfellow Hazardous Waste Site Remedial Investigation Draft Final Report: Appendix D and E (Aquifer Test Data and Water Level Data). Prepared by Science Applications International Corporation for the California Department of Health Services Toxic Substances Control Division. June 1, 1987.
Stringfellow Hazardous Waste Site Remedial Investigation Draft Final Report: Appendix F, G, and H (Chemistry Data, Meteorological Data, and Groundwater Model). Prepared by Science Applications International Corporation for the California Department of Health Services Toxic Substances Control Division. June 1, 1987.
Stringfellow facility remedial investigation/feasibility study reports:
Draft Report: Stringfellow Facility Remedial Investigation/Feasibility Study Task III: August, 1984 Groundwater Monitoring Survey . Prepared for the State of California Department of Health Services, Division of Toxic Substances Control, by JRB Associates, A Company of Science Applications International Corporation. December 19, 1984.
Draft Report: Stringfellow Facility Remedial Investigation/Feasibility Study Task III: October, 1984 Groundwater Monitoring Survey . Prepared for the State of California Department of Health Services, Division of Toxic Substances Control, by Science Applications International Corporation. January 18, 1985.
Draft Report: Stringfellow Facility Remedial Investigation/Feasibility Study Task III: September, 1984 Electrical Resistivity Survey . Prepared for the State of California Department of Health Services, Division of Toxic Substances Control, by Science Applications International Corporation. February 11, 1985.
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study: Routine Groundwater Monitoring Survey, January, 1985 . Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation (JRB Associates). March 28, 1985.
Final Report: Stringfellow Facility Remedial Investigation/Feasibility Study: Task IV: Preliminary Remedial Technologies. Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation (JRB Associates). April 4, 1985.
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study: Routine Groundwater Monitoring Survey, February, 1985 . Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation (JRB Associates). May 22, 1985.
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study: Routine Groundwater Monitoring Survey, March, 1985 . Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation (JRB Associates). May 22, 1985.
Interim Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Soil Gas Sampling Survey, April 18-May 2, 1985 . Prepared for the State of California Department of Health Services, Division of Toxic Substances Control, by Science Applications International Corporation (JRB Associates). May 28, 1985.
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study: Routine Groundwater Monitoring Survey, April, 1985 . Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation (JRB Associates). June 13, 1985.
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Survey, May, 1985 . Prepared for the State of California Department of Health Services, Division of Toxic Substances Control, by Science Applications International Corporation (JRB Associates). July 19, 1985.
Stringfellow Facility Remedial Investigation/Feasibility Study: Draft Interim Report on Development and Screening of Remedial Technologies and Alternatives . Prepared as a Working Document for the State of California Department of Health Services, Division of Toxic Substances Control, by Science Applications International Corporation (JRB Associates). July 31, 1985.
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Survey, June, 1985 . Prepared for the State of California Department of Health Services, Division of Toxic Substances Control, by Science Applications International Corporation (JRB Associates). September 4, 1985.
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Survey, July, 1985 . Prepared for the State of California Department of Health Services, Division of Toxic Substances Control, by Science Applications International Corporation (JRB Associates). December 27, 1985.
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Survey, August, 1985 . Prepared for the State of California Department of Health Services, Division of Toxic Substances Control, by Science Applications International Corporation (JRB Associates). December 27, 1985.
Draft Report: Stringfellow Facility Remedial Investigation/Feasibility Study: Combined Tasks XI and XII: Development and Initial Screening of Alternatives . Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation. May 30, 1986.
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Survey Annual Report for 1985 . Prepared for the State of California Department of Health Services, Division of Toxic Substances Control, Site Cleanup and Emergency Response Section, by Science Applications International Corporation. June 11, 1986.
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Survey, September, 1986 . Prepared for the State of California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation. October 16, 1986.
Second Draft: Assessment of an Extraction Well Barrier in the Lower Canyon, A Proposed Early Implementation Action at the Stringfellow Hazardous Waste Site: Stringfellow Facility Remedial Investigation/Feasibility Study: Task XXII.3 . Prepared for the California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation. December 16, 1986.
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Survey, October, 1986 . Prepared for the State of California Department of Health Services, Division of Toxic Substances Control, by Science Applications International Corporation. December 18, 1986.
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Survey Annual Report for 1985 . Prepared for the State of California Department of Health Services, Division of Toxic Substances Control, Site Cleanup and Emergency Response Section, by Science Applications International Corporation. December 24, 1986.
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Survey, November, 1986 . Prepared for the State of California Department of Health Services, Division of Toxic Substances Control, by Science Applications International Corporation. January 30, 1987.
Stringfellow Facility Remedial Investigation/Feasibility Study: Task XXII.3 Draft Report: An Assessment of Drainage Improvements at the North End of the Canyon, a Proposed Early Implementation Action . Prepared for the California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation. February 3, 1987.
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Survey, February, 1987 . Prepared for the State of California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation. April 20, 1987.
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Survey, January, 1987 . Prepared for the State of California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation. May 18, 1987.
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Survey, March, 1987 . Prepared for the State of California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation. June 12, 1987.
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Survey, April, 1987 . Prepared for the State of California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation. June 19, 1987.
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Survey, May, 1987 . Prepared for the State of California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation. July 2, 1987.
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Survey, June, 1987 . Prepared for the State of California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation. August 3, 1987.
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Surveys, July-September, 1987 . Prepared for the State of California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation. December 9, 1987.
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Surveys: November-December, 1987; January 1988 . Prepared for the California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation. January 26, 1989.
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Surveys: March-May, 1988 . Prepared for the California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation. January 27, 1989.
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Surveys: July-September, 1988 . Prepared for the California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation. June 12, 1989.
Stringfellow facility remedial investigation/feasibility study work plans:
Draft: Stringfellow Facility Remedial Investigation/Feasibility Study Work Plan Task III: Stringfellow Routine Groundwater Monitoring Program . Prepared for the State of California Department of Health Services, Division of Toxic Substances Control, by JRB Associates, A Company of Science Applications International Corporation. December 18, 1984.
Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Task III: Stringfellow Routine Groundwater Monitoring Program . Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation (JRB Associates). January 18, 1985.
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Air Quality Assessment. Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation (JRB Associates). February 11, 1985.
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Task III: Pyrite Canyon Field Investigation. Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation (JRB Associates). March 4, 1985.
Final Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Air Quality Assessment. Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation (JRB Associates). April 1, 1985.
Final Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Task III: Pyrite Canyon Field Investigation. Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation (JRB Associates). April 19, 1985.
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Combined Tasks XI and XII: Development and Initial Screening of Alternatives . Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation (JRB Associates). April 30, 1985.
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Air Stripping of Volatile Organic Carbon Contaminants: A Treatability Study Under Task XIII . Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation (JRB Associates). July 19, 1985.
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Leachate Treatment by Activated Carbon: A Treatment Study Under Task XIII . Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation (JRB Associates). July 19, 1985.
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Treatment by Soil Washing Techniques: A Treatment Study Under Task XIII . Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation (JRB Associates). July 19, 1985.
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Task XIV: Evaluation of Remedial Alternatives and Selection of the Cost Effective Alternative . Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation (JRB Associates). November 26, 1985.
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study Task III: Groundwater Modeling. Prepared for the State of California Department of Health Services, Division of Toxic Substances Control, by Science Applications International Corporation (JRB Associates). December 3, 1985.
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Task III: Workplan for Drill Cuttings Disposal, Disturbed Site Emissions Measurement and Bulk Sampling . Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation (JRB Associates). December 10, 1985.
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Task III: Additional Community Monitoring Wells . Prepared for the California Department of Health Services, Toxic Substances Control Division, Site Cleanup and Emergency Response Section, Technical Unit, by Science Applications International Corporation (JRB Associates). January 8, 1986.
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Task XXII.2: Maintenance and Revegetation of the Stringfellow Hazardous Waste Site . Prepared for the California Department of Health Services, Toxic Substances Control Division, Site Cleanup and Emergency Response Section, by Science Applications International Corporation (JRB Associates). January 8, 1986.
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Task V: Remedial Investigation Report. Prepared for the California Department of Health Services, Toxic Substances Control Division, Site Cleanup and Emergency Response Section, by Science Applications International Corporation (JRB Associates). January 8, 1986.
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Task III: Routine Groundwater Monitoring Survey (Continuation from January to June, 1986) . Prepared for the California Department of Health Services, Toxic Substances Control Division, Site Cleanup and Emergency Response Section, by Science Applications International Corporation (JRB Associates). January 8, 1986.
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Task XIII: A Treatability Study Reverse Osmosis and Ultrafiltration Treatment of Contaminated Groundwater . Prepared for the California Department of Health Services, Toxic Substances Control Division, Site Cleanup and Emergency Response Section, Technical Unit, by Science Applications International Corporation (JRB Associates). January 9, 1986.
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Task III: Technical Support to DTC Summer 1986 Pyrite Canyon Investigations . Prepared for the California Department of Health Services, Toxic Substances Control Division, Site Cleanup and Emergency Response Section, by Science Applications International Corporation. June 19, 1986.
Revision No. 3 of Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Task XXII.3: Early Implementation Actions (Formerly Called Operable Unit Development) . Prepared for the California Department of Health Services, Toxic Substances Control Division, Site Cleanup and Emergency Response Section, by Science Applications International Corporation. July 16, 1986.
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Task XIV: Detailed Evaluation of Remedial Alternatives . Prepared for the California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation. July 24, 1986.
Revision No. 2 Draft Workplan: Stringfellow Facility Remedial Investigation/Feasibility Study: Task XIII: A Treatability Study Reverse Osmosis Treatment of Contaminated Groundwater: Phase 2 . Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation (JRB Associates). December 29, 1986.
Addendum No. 1 to Revision No. 2 of Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Task III: Incineration Treatability Study . Prepared for the California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation. February 11, 1987.
Draft Work Plan Addendum: Stringfellow Facility Remedial Investigation/Feasibility Study: Task XIII: Phase III Incineration Treatability Study: Soil Excavation, Preparation, Containerization and Testing . Prepared for the California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation. May 29, 1987.
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study Task III: Routine Groundwater Monitoring Survey Phase III: July, 1987 to September 1988 . Prepared for the State of California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation. July 15, 1987.
Draft Work Plan Addendum No. 2: Stringfellow Facility Remedial Investigation/Feasibility Study: Task XIII: Phase III Incineration Treatability Study: Soil Excavation, Preparation, Containerization and Testing . Prepared for the California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation. July 15, 1987.
Draft Work Plan Revision No. 2 (Second Version): Stringfellow Facility Remedial Investigation/Feasibility Study: Task XIV: Detailed Evaluation of Remedial Alternatives . Prepared for the California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation. November 6, 1987.
Preliminary Work Plan Revision to Task III Routine Groundwater Monitoring, Phase III Work Plan: Detailed Chemical Characterization of Selected Monitoring Wells . Prepared by the California Department of Health Services, Toxic Substances Control Division. 1987.
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Task XXII.I: Workplan for Custodial Services. Prepared for the California Department of Health Services, Toxic Substances Control Division, Site Cleanup and Emergency Response Section, Technical Unit, by Science Applications International Corporation (JRB Associates). 1986.
Stringfellow facility remedial investigation/feasibility study other documents:
Waste Discharge Review Interim Treatment and Disposal Program. Prepared by the State of California Health and Welfare Agency, Department of Health Services. January 1985.
Remedial Investigation/Feasibility Study Community Relations Support: Educational Package. Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation. circa 1987.
Stringfellow Facility Remedial Investigation/Feasibility Study: Packer Sampling of Selected Bedrock Wells. Prepared for the California Department of Health Services, Toxic Substances Control Division, Stringfellow Site Management Team, by Science Applications International Corporation. November 19, 1987.
Sub-series 3.2 California Environmental Protection Agency. Department of Toxic Substances Control. 1996-2009.
Sub-series Scope and Content Summary
Annual reports:
Draft Background Review Report: Stringfellow Hazardous Waste Site. Prepared by ENVIRON Corporation for the Department of Toxic Substances Control. March 20, 1998.
Final Semi-Annual Report: Stringfellow Hazardous Waste Site: From Period May 1, 1999 to December 31, 1999. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control. January 2001.
Final Annual Report: Stringfellow Hazardous Waste Site: From Period January 1, 2000 to December 31, 2000. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control. November 2001.
Stringfellow 2001 Annual Report. Prepared by Tetra Tech, Inc. for the California Department of Toxic Substances Control, Stringfellow Branch. December 2004.
Stringfellow 2002 Annual Report. Prepared by Tetra Tech, Inc. for the California Department of Toxic Substances Control, Stringfellow Branch. December 2004.
Stringfellow 2003 Annual Report. Prepared by Tetra Tech, Inc. for the California Department of Toxic Substances Control, Stringfellow Branch. March 2006.
"Stringfellow 2003 Annual Report" (CD). Prepared by Tetra Tech, Inc. March 2006.
Stringfellow 2004 Annual Report: Draft. Prepared by Tetra Tech, Inc. for the California Department of Toxic Substances Control, Stringfellow Branch. February 2008.
Stringfellow 2005 Annual Report. Prepared by Tetra Tech, Inc. for the California Department of Toxic Substances Control, Stringfellow Branch. December 2008.
Bench-scale testing:
Final Bench-Scale Testing Summary Report for Sequential Biological Treatment of Groundwater (Volume 1 of 2). Prepared by Shaw Environmental, Inc. for the California Department of Toxic Substances Control. December 2004.
Final Bench-Scale Testing Summary Report for Sequential Biological Treatment of Groundwater (Volume 2 of 2). Prepared by Shaw Environmental, Inc. for the California Department of Toxic Substances Control, Stringfellow Branch. December 2004.
"Final Bench-Scale Testing Summary Report for Sequential Biological Treatment of Groundwater" (Volume 1 and 2, CD). Prepared by Shaw Environmental, Inc. December 2004.
Final Bench-Scale Testing Summary Report for Advanced Oxidation Processes. Prepared by Shaw Environmental, Inc. for the California Department of Toxic Substances Control. January 2005.
"Final Bench-Scale Testing Summary Report for Advanced Oxidation Processes" (CD). Prepared by Shaw Environmental, Inc. for the California Department of Toxic Substances Control. January 2005.
Final Bench-Scale Testing Summary Report for Ion-Exchange Technology. Prepared by Shaw Environmental, Inc. for the California Department of Toxic Substances Control, Stringfellow Branch. February 2005.
"Final Bench-Scale Testing Summary Report for Ion-Exchange Technology" (CD). Prepared by Shaw Environmental, Inc. February 2005.
Final Bench-Scale Testing Summary Report for Ultraviolet Treatment Technology. Prepared by Shaw Environmental, Inc. for the California Department of Toxic Substances Control, Stringfellow Branch. March 2005.
"Final Bench-Scale Testing Summary Report for Ultraviolet Treatment Technology" (CD). Prepared by Shaw Environmental, Inc. March 2005.
Groundwater monitoring:
Final Site Safety and Health Plan for the Stringfellow Hazardous Waste Site Groundwater Monitoring Program (two copies). Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control. March 1997.
Final Quality Assurance Project Plan for the Stringfellow Hazardous Waste Site Groundwater Monitoring Program. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program. March 1997.
Final Work Plan for the Stringfellow Hazardous Waste Site Groundwater Monitoring Program. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program. March 1997.
Final Groundwater Monitoring Report: Spring 1997. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control. August 1997.
Final Groundwater Monitoring Report: Fall 1997: Appendix A Volume 1. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control. December 1997.
Final Groundwater Monitoring Report: Fall 1997: Appendix A Volume 2. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation. December 1997.
Final Groundwater Monitoring Report: Fall 1997: Appendix A Volume 3. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation. December 1997.
Final Groundwater Monitoring Report: Fall 1997. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control. January 1998.
Final Groundwater Monitoring Report: Spring 1998: Appendix Volume 1. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program. June 1998.
Final Groundwater Monitoring Report: Spring 1998: Appendix Volume 2. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program. June 1998.
Final Groundwater Monitoring Report: Spring 1998: Appendix Volume 3. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program. June 1998.
Final Groundwater Monitoring Report: Spring 1998: Appendix Volume 4. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program. June 1998.
Report of the June 1998 Non-Routine Groundwater Monitoring Event. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program. July 1998.
Final Groundwater Monitoring Report: Spring 1998: Volume 1. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program. August 1998.
Final Groundwater Monitoring Report: Spring 1998: Volume 2. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program. August 1998.
Final Groundwater Monitoring Report: Fall 1998: Appendix Volume 1. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program. December 1998.
Final Groundwater Monitoring Report: Fall 1998: Appendix Volume 2. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program. December 1998.
Final Groundwater Monitoring Report: Fall 1998: Volume 1. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program. March 1999.
Final Groundwater Monitoring Report: Fall 1998: Volume 2. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program. March 1999.
Final Groundwater Monitoring Report: Fall 1998: Appendix Volume 3. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program. March 1999.
Final Groundwater Monitoring Report: Spring 1999: Appendix Volume 1. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program. June 1999.
Final Groundwater Monitoring Report: Spring 1999: Appendix Volume 2. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program. June 1999.
Final Groundwater Monitoring Report: Spring 1999: Volume 1. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program. July 1999.
Final Groundwater Monitoring Report: Spring 1999: Volume 2. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program. July 1999.
Final Groundwater Monitoring Report: Fall 1999: Appendix Volume 1. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program. December 1999.
Final Groundwater Monitoring Report: Fall 1999: Appendix Volume 2. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program. December 1999.
Final Groundwater Monitoring Report: Fall 1999. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program. February 2000.
Final Groundwater Monitoring Report: Spring 2000 Volume 1. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program. July 2000.
Final Groundwater Monitoring Report: Spring 2000 Volume 2. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program. July 2000.
Final Groundwater Monitoring Report: Spring 2000: Appendix Volume 1. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program. July 2000.
Final Groundwater Monitoring Report: Spring 2000: Appendix Volume 2. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program. July 2000.
Non-Routine Groundwater Monitoring Report: August 2001. Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the California Department of Toxic Substances Control, Stringfellow Branch. January 2002.
Non-Routine Groundwater Monitoring Report: September 2001. Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the California Department of Toxic Substances Control, Stringfellow Branch. January 2002.
Non-Routine Groundwater Monitoring Report: January 2002. Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the California Department of Toxic Substances Control, Stringfellow Branch. March 2002.
Groundwater Monitoring Report: Fall 2001: Volume 1. Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the California Department of Toxic Substances Control, Stringfellow Branch. March 2002.
Groundwater Monitoring Report: Fall 2001: Volume 2. Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the California Department of Toxic Substances Control, Stringfellow Branch. March 2002.
Non-Routine Groundwater Monitoring Report: April 2002. Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the California Department of Toxic Substances Control, Stringfellow Branch. July 2002.
Non-Routine Groundwater Monitoring Report: June 2002. Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the California Department of Toxic Substances Control, Stringfellow Branch. August 2002.
Non-Routine Groundwater Monitoring Report: October 2002. Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the California Department of Toxic Substances Control, Stringfellow Branch. December 2002.
Groundwater Monitoring Report: Spring 2006: Volume 1. Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the California Department of Toxic Substances Control, Stringfellow Branch. September 2006.
Groundwater Monitoring Report: Fall 2006: Volume 1. Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the California Department of Toxic Substances Control, Stringfellow Branch. January 2007.
Groundwater Monitoring Report: Spring 2007: Volume 1. Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the California Department of Toxic Substances Control, Stringfellow Branch. August 2007.
"Groundwater Monitoring Report: Spring 2007" (CD). Prepared by Geo-Logic Associates. August 2007.
Groundwater Monitoring Report: Fall 2007: Volume 1. Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the California Department of Toxic Substances Control, Stringfellow Branch. March 2008.
"Groundwater Monitoring Report: Fall 2007" (CD). Prepared by Geo-Logic Associates. March 2008.
Groundwater Monitoring Report: Spring 2008: Volume 1. Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the California Department of Toxic Substances Control, Stringfellow Branch. March 2009.
"Groundwater Monitoring Report: Spring 2008" (CD). Prepared by Geo-Logic Associates. March 2009.
Pre-treatment plant effluent pipeline project:
"Air Quality Analysis: Stringfellow Site: PTP Effluent Pipeline Project." Prepared by JHA Environmental Consultants, LLC for the Department of Toxic Substances Control. October 28, 1997.
"Response to Comments: Proposed Negative Declaration and Initial Study for Stringfellow PTP Effluent Pipeline Project." Prepared by the Department of Toxic Substances Control. December 22, 1997.
Stormwater sampling:
Stormwater Sampling Results Letter Report (December 2008). Prepared by GeoLogic Associates for the California Department of Toxic Substances Control, Legacy Landfills Branch. February 25, 2009.
February 2009 Stormwater Sampling Results Letter Report. Prepared by GeoLogic Associates for the California Department of Toxic Substances Control, Legacy Landfills Branch. March 3, 2009.
Supplemental feasibility study:
Draft Supplemental Feasibility Study: Volume 1: Report. Prepared by ENVIRON Corporation for the Department of Toxic Substances Control. April 21, 2000.
Draft Supplemental Feasibility Study: Volume 2: Appendices. Prepared by ENVIRON Corporation for the Department of Toxic Substances Control. April 21, 2000.
Draft Supplemental Feasibility Study: Volume 3: Appendices. Prepared by ENVIRON Corporation for the Department of Toxic Substances Control. April 21, 2000.
Final Draft Supplemental Feasibility Study: Volume 1: Report. Prepared by ENVIRON International Corporation for the Department of Toxic Substances Control. December 21, 2007.
Final Draft Supplemental Feasibility Study: Volume 2: Appendices. Prepared by ENVIRON International Corporation for the California Department of Toxic Substances Control. December 21, 2007.
Final Draft Supplemental Feasibility Study: Volume 3: Appendices. Prepared by ENVIRON International Corporation for the California Department of Toxic Substances Control. December 21, 2007.
"Final Draft Supplemental Feasibility Study: Volumes 1 through 3" (CD). Prepared by ENVIRON International Corporation. December 21, 2007.
Surface water monitoring:
Winter 2006 Surface Water Monitoring Report. Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the Department of Toxic Substances Control, Stringfellow Branch. June 2006.
"Winter 2006 Surface Water Monitoring Report" (CD). Prepared by GeoLogic Associates. June 2006.
Winter 2008 Surface Water Monitoring Report. Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the Department of Toxic Substances Control, Stringfellow Branch. June 2008.
Well/piezometer installation:
Stringfellow - Zone 1: Extraction Well and Piezometer Installation and Testing, Riverside, California. Prepared by URS Greiner, Inc. - California for the Department of Toxic Substances Control. March 1998.
Cone Penetrometer Testing and Well/Piezometer Installation Work Plan. Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the California Department of Toxic Substances Control, Stringfellow Branch. September 2001.
Zone 3:
Zone 3 Deep Soil Gas Survey Report. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control. June 7, 1999.
Step-Drawdown and Long-Term Pumping Tests: Zone 3 Monitoring Wells. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control. March 2000.
Zone 4:
Phase I Report: Community Extraction System Design Data Collection and Private Well Sampling: Stringfellow - Zone 4. Prepared by URS Consultants, Inc. for the Department of Toxic Substances Control. August 1996.
Zone 4 Subsurface Investigation. Prepared by GeoLogic Associates for the California Department of Toxic Substances Control, Stringfellow Branch. February 2003.
Stringfellow Perchlorate Plume Definition in Zone 4: Appendix H. Prepared by Kleinfelder West, Inc. for the California Department of Toxic Substances Control, Legacy Landfill and RCRA Corrective Actions Program. May 2008.
Groundwater Modeling Work Plan: Stringfellow Superfund Site Zone 4. Prepared by Kleinfelder West, Inc. for the California Department of Toxic Substances Control, Stringfellow Branch. January 28, 2009.
In-Situ Bioremediation Pilot Test Work Plan: Stringfellow Superfund Site Zone 4. Prepared by Kleinfelder West, Inc. for the California Department of Toxic Substances Control, Stringfellow Branch. January 29, 2009.
Draft: Zone 4 Remedial Investigation Report. Prepared by Kleinfelder West, Inc. for the California Department of Toxic Substances Control, Legacy Landfill and Corrective Action Office. March 17, 2009.
"Zone 4 Remedial Investigation Report" (CD). Prepared by Kleinfelder West, Inc. March 17, 2009.
In-Situ Bioremediation Pilot Study Work Plan: Stringfellow Superfund Site Zone 4. Prepared by Kleinfelder West, Inc. for the California Department of Toxic Substances Control, Stringfellow Branch. April 27, 2009.
Groundwater Modeling Work Plan: Stringfellow Superfund Site Zone 4. Prepared by Kleinfelder West, Inc. for the California Department of Toxic Substances Control, Stringfellow Branch. May 18, 2009.
Other documents:
Final Clay Barrier Testing - Pumping Test Work Plan. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control. May 3, 2000.
UXO Avoidance and Debris Removal Report. Prepared by GeoLogic Associates for the California Department of Toxic Substances Control, Stringfellow Branch. June 2003.
Zone 1 Monitoring Well OW-15D Conversion Construction Summary Report. Prepared by GeoLogic Associates for the California Department of Toxic Substances Control, Stringfellow Branch. March 2007.
Monitoring Wells FC-161A, FC-162A, and FC-163A Decommissioning Report. Prepared by GeoLogic Associates for the California Department of Toxic Substances Control, Stringfellow Branch. March 2008.
Passive Sampling Pilot Study Report. Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the California Department of Toxic Substances Control. February 2009.
Sub-series 3.3 Pyrite Canyon Group 1991-circa 2000.
Sub-series Scope and Content Summary
AOC-10 and CD Scope of Work Quarterly Reports:
Stringfellow Project AOC-10 and CD Scope of Work Quarterly Report No. 1. Prepared by Bechtel Environmental, Inc. for the Pyrite Canyon Group. November 9, 1992.
Stringfellow Project AOC-10 and CD Scope of Work Quarterly Report No. 7. Prepared by Bechtel Environmental, Inc. for the Pyrite Canyon Group. May 10, 1994.
Community extraction system:
Community Extraction System Final Interim Operation Plan (Project No. 22020-003). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. November 1992.
Community Extraction System Interim Operation: Six-Month Evaluation Report No. 1 (Project No. 22020-003). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. June 1993.
Community Extraction System Interim Operation: Six-Month Evaluation Report No. 2 (Project No. 22020-003). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. December 1993.
Community Extraction System Interim Operation: Six-Month Evaluation Report No. 3 (Project No. 22020-003). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. June 1994.
Community Extraction System Interim Operation: Six-Month Evaluation Report No. 4 (Project No. 22020-003). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. December 1994.
Achievement of Performance Standard Community Extraction System Element of Work. Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. January 1995.
Community Extraction System Interim Operation: Six-Month Evaluation Report No. 5 (Project No. 22020-003). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. September 1995.
Achievement of Performance Standard Community Extraction System Element of Work. Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. February 1996.
Community Extraction System Interim Operation: Six-Month Evaluation Report No. 6 (Project No. 22020-003). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. February 1996.
Community Extraction System Interim Operation: Six-Month Evaluation Report No. 7 (Project No. 22020-003). Prepared by S.S. Papadopulos and Associates, Inc. and Pyrite Canyon Group. September 1996.
Community Extraction System Interim Operation: Six-Month Evaluation Report No. 8. Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. July 1997.
Community Extraction System Interim Operation: Six-Month Evaluation Report No. 9. Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. November 1997.
Community Extraction System Interim Operation: Six-Month Evaluation Report No. 10. Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. July 1998.
Community Extraction System Interim Operation: Six-Month Evaluation Report No. 11. Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. December 1998.
Community Extraction System Interim Operation: Six-Month Evaluation Report No. 13. Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. April 1999.
Community Extraction System Interim Operation: Six-Month Evaluation Report No. 12. Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. March 1999.
Community well test program:
Pyrite Canyon Group Community Well Test Program Phase I. Prepared by Bechtel National, Inc. for Pyrite Canyon Group. May 1991.
Community Well Test Program Phase I: Final Report of the Short-Term Tests: Volume 1 - Report. Prepared by S.S. Papadopulos and Associates, Inc. and Bechtel Environmental, Inc. for the Pyrite Canyon Group. June 1991.
Community Well Test Program Phase I: Final Report of the Short-Term Tests: Volume 2 - Appendices A-E. Prepared by S.S. Papadopulos and Associates, Inc. and Bechtel Environmental, Inc. for the Pyrite Canyon Group. June 1991.
Community Well Test Program Phase 1: Final Health and Safety Plan for the Permanent Facilities Installation. Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group. March 1991.
Community Well Test Program Phase I: Final Quality Assurance/Quality Control Plan for the Permanent Facilities Installation. Prepared by Bechtel Environmental, Inc. for the Pyrite Canyon Group. March 1991.
Pyrite Canyon Group Community Well Test Program Phase 1: Technical Specifications. Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group Stringfellow Project. May 1991.
Community Well Test Program Phase I: Final Report of the Short-Term Tests: Volume 3 - Appendices F & G. Prepared by S.S. Papadopulos and Associates, Inc. and Bechtel Environmental, Inc. for the Pyrite Canyon Group. June 1991.
Community Well Test Program Phase 1: Final Long-Term Test Plan. Prepared by S.S. Papadopulos and Associates, Inc. and Bechtel Environmental, Inc. for Pyrite Canyon Group. December 1991.
Community Well Test Program: Final Health and Safety Plan (Project No. 22020-003). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group. November 1992.
Community Well Test Program Phase I: Monthly Report No. 27 (three copies). Prepared by Bechtel Environmental, Inc. for the Pyrite Canyon Group. November 10, 1992.
Community Well Test Program Phase 1 Final Report: Volume 1 - Report. Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. March 1993.
Community Well Test Program Phase 1 Final Report: Volume 2 Appendices. Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. March 1993.
Routine groundwater monitoring:
Final Routine Groundwater Monitoring Plan (Project No. 22020-004). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group. November 1992.
Routine Groundwater Monitoring: Final Supplement to the Project Health and Safety Plan (Project No. 22020-004). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group; two copies. November 1992.
Routine Groundwater Monitoring Annual Report - Spring 1993: Volume 2 Appendices (Project No. 22020-004). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. June 1993.
Routine Groundwater Monitoring Annual Report - Spring 1993: Volume 3 Appendices (Project No. 22020-004). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. June 1993.
Routine Groundwater Monitoring Semi-Annual Report - Fall 1993: Volume 1 Report (Project No. 22020-004). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. December 1993.
Routine Groundwater Monitoring Semi-Annual Report - Fall 1993: Volume 2 Appendices (Project No. 22020-004). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. December 1993.
Routine Groundwater Monitoring Semi-Annual Report - Fall 1993: Volume 3 Appendices (Project No. 22020-004). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. December 1993.
Routine Groundwater Monitoring Biennial Report - Spring 1994: Volume 1 - Report (Project No. 22020-004). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. June 1994.
Routine Groundwater Monitoring Semi-Annual Report - Fall 1994: Volume 2 Appendices (Project No. 22020-004). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. December 1994.
Routine Groundwater Monitoring Semi-Annual Report - Fall 1994: Volume 1 - Report (Project No. 22020-004). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. December 1994.
Routine Groundwater Monitoring Annual Report - Spring 1995: Volume I - Report (Project No. 22020-004). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. September 1995.
Routine Groundwater Monitoring Semi-Annual Report - Fall 1995: Volume 1 Report (Project No. 22020-004). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. March 1996.
Routine Groundwater Monitoring Biennial Report - Spring 1996: Volume I - Report. Prepared by Pyrite Canyon Group, Inc. and S.S. Papadopulos and Associates, Inc. March 1997.
Routine Groundwater Monitoring Biennial Report - Spring 1996: Volume II - Appendices A and B. Prepared by Pyrite Canyon Group, Inc. and S.S. Papadopulos and Associates, Inc. March 1997.
Routine Groundwater Monitoring Biennial Report - Spring 1996: Volume III - Appendix B (continued). Prepared by Pyrite Canyon Group, Inc. and S.S. Papadopulos and Associates, Inc. March 1997.
Routine Groundwater Monitoring Biennial Report - Spring 1996: Volume IV - Appendix B (continued). Prepared by Pyrite Canyon Group, Inc. and S.S. Papadopulos and Associates, Inc. March 1997.
Routine Groundwater Monitoring Biennial Report - Spring 1996: Volume V - Appendix B (continued). Prepared by Pyrite Canyon Group, Inc. and S.S. Papadopulos and Associates, Inc. March 1997.
Routine Groundwater Monitoring Biennial Report - Spring 1996: Volume VI - Appendix B (continued). Prepared by Pyrite Canyon Group, Inc. and S.S. Papadopulos and Associates, Inc. March 1997.
Routine Groundwater Monitoring Biennial Report - Spring 1996: Volume VII - Appendix B (continued). Prepared by Pyrite Canyon Group, Inc. and S.S. Papadopulos and Associates, Inc. March 1997.
Routine Groundwater Monitoring Biennial Report - Spring 1996: Volume VIII - Appendix B (continued). Prepared by Pyrite Canyon Group, Inc. and S.S. Papadopulos and Associates, Inc. March 1997.
Routine Groundwater Monitoring Semi-Annual Report: Fall 1996: Volume I Report, Appendix A. Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. September 1997.
Routine Groundwater Monitoring Semi-Annual Report: Fall 1996: Volume II Appendix B. Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. September 1997.
Routine site maintenance operations:
Final Routine Site Maintenance Operations Plan. Prepared by Pyrite Canyon Group. December 1992.
Routine Site Maintenance Operations: Final Supplement to the Project Health and Safety Plan. Prepared by Pyrite Canyon Group. December 1992.
Soil vapor extraction field test:
Final Soil Vapor Extraction Field Test Design Report (Project No. 22020-001). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group. February 1993.
Final Soil Vapor Extraction Field Test Plan (Project No. 22020-001). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group. February 1993.
Soil Vapor Extraction Field Test: Final Supplement to the Project Health and Safety Plan (Project No. 22020-001). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group. (two copies) May 1993.
Final Soil Vapor Extraction Field Test Evaluation Report: Volume 1 Report (Project No. 22020-001). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group. November 1994.
Final Soil Vapor Extraction Field Test Evaluation Report: Volume 2 Appendices (Project No. 22020-001). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group. November 1994.
Final Soil Vapor Extraction Field Test Evaluation Report: Volume 3 Appendices (Project No. 22020-001). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group. November 1994.
Final Soil Vapor Extraction Field Test Evaluation Report: Volume 4 Appendices (Project No. 22020-001). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group. November 1994.
Work plans:
Zone 1 Soil Gas Survey: Final Health and Safety Plan. Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group. May 1992.
Final Work Plan: Community Relations Support Activities by Settling Defendants for the Interim Rod Implementation at Stringfellow Superfund Site . Prepared for Settling Defendant by Pyrite Canyon Group, Inc. November 5, 1992.
Final Project Health and Safety Plan (Project No. 22020). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group. May 1993.
Work Plan for Further Work in Zone 4. Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. August 1997.
Zone 1 dewatering system:
Final Zone 1 Dewatering System Plan (Project No. 22020-005). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group. January 1993.
Zone 1 Dewatering System: Final Supplement to the Project Health and Safety Plan (Project No. 22020-005). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group. January 1993.
Final Zone 1 Dewatering System Design Report (Project No. 22020-005). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group. September 1993.
Construction Completion and Construction As-Built Report for All Zone 1 Dewatering System Components: Volume 1 Report, Appendices A-G (Project No. 22020-005). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group. June 1994.
Construction Completion and Construction As-Built Report for All Zone 1 Dewatering System Components: Volume II - Appendices H, I (Project No. 22020-005). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group. June 1994.
Zone 1 Dewatering System Six-Month Evaluation Report No. 1 (Project No. 22020-005). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group. November 1994.
Measurement of Performance Standard Bedrock Hydraulic Control Component (affiliated with Zone 1 Dewatering System Element of Work). Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. January 1995.
Measurement of Performance Standard Upgradient Interception Component (affiliated with Zone 1 Dewatering System Element of Work). Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. January 1995.
Zone 1 Dewatering System Six-Month Evaluation Report No. 2 (Project No. 22020-005). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group. September 1995.
Measurement of Performance Standard Upgradient Interception Component (affiliated with Zone 1 Dewatering System Element of Work). Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. August 1995.
Measurement of Performance Standard Bedrock Hydraulic Control Component (affiliated with Zone 1 Dewatering System Element of Work). Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. August 1995.
Zone 1 Dewatering System Six-Month Evaluation Report No. 3 (Project No. 22020-005). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group. May 1996.
Zone 1 Dewatering System Six-Month Evaluation Report No. 4. Prepared by Pyrite Canyon Group. January 1997.
Achievement of Performance Standard Bedrock Hydraulic Control Component (affiliated with Zone 1 Dewatering System Element of Work). Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. July 1997.
Achievement of Performance Standard Upgradient Interception Component (affiliated with Zone 1 Dewatering System Element of Work). Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. July 1997.
Zone 1 Dewatering System Six-Month Evaluation Report No. 5. Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. January 1998.
Zone 1 Dewatering System Six-Month Evaluation Report No. 6. Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. March 1998.
Zone 1 Dewatering System Six-Month Evaluation Report No. 7. Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. August 1998.
Zone 1 Dewatering System Six-Month Evaluation Report No. 10. Prepared by S.S. Papadopulos and Associates, Inc. and Pyrite Canyon Group. May 1999.
Zone 1 Dewatering System Six-Month Evaluation Report No. 10 (Further Work in Zone 4): Volume II: Appendix D. Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. April 1999.
Zone 1 Dewatering System Six-Month Evaluation Report No. 8. Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. December 1998.
Zone 1 Dewatering System Six-Month Evaluation Report No. 9. Prepared by S.S. Papadopulos and Associates, Inc. and Pyrite Canyon Group. March 1999.
Zone 3 field investigation:
Final Zone 3 Field Investigation Plan (Project No. 22020-002). Prepared by S.S. Papadopulos and Associates, Inc. and Bechtel Environmental, Inc. for Pyrite Canyon Group. September 1993.
Zone 3 Field Investigation: Final Supplement to the Project Health and Safety Plan (Project No. 22020-002). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group. September 1993.
Other documents:
Final Interim Report of Feasibility of Re-Injection and Screening of Water Management Options (Project No. 22020-002). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. August 1993.
Final Water Management Report (Project No. 22020-002). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group. August 1994.
3D Seismic Reflection Imaging Interpretation at the Stringfellow Hazardous Waste Site - Zones 2 & 3, Riverside County, California: Addendum 4 (Draft Final). Submitted by Resolution Resources, Inc. to URS Greiner Woodward-Clyde. Prepared for the Department of Toxic Substances Control. November 1999.
Maps, charts, and graphs containing data about Stringfellow Hazardous Waste Site zones. Material is from an unidentified report. circa 2000.
Sub-series 3.4 Santa Ana Watershed Project Authority 1984.
Sub-series Scope and Content Summary
Final Draft Predesign Report for Interim Treatment Facilities. Prepared by James M. Montgomery, Consulting Engineers, Inc. for the Santa Ana Watershed Project Authority. September 1984.
Proposed Stringfellow Interim Treatment Facility (a geotechnical reconnaissance). Prepared by Geotechnical Consultants, Inc. for the Santa Ana Watershed Project Authority, Riverside, California. September 1984.
Specifications for Furnishing Equipment for Interim Treatment Facilities (procurement documents). Prepared by James M. Montgomery, Consulting Engineers, Inc. for the Santa Ana Watershed Project Authority (agent for the State of California Department of Health Services). September 1984.
Construction of Interim Treatment Facilities for the Stringfellow Hazardous Waste Site: Specifications and Reduced Drawings. Prepared by James M. Montgomery, Consulting Engineers, Inc. for the Santa Ana Watershed Project Authority (agent for owner: State of California Department of Health Services). October 1984.
Draft Operation and Maintenance Manual for Interim Treatment Facilities. Prepared by James M. Montgomery, Consulting Engineers, Inc. for the Santa Ana Watershed Project Authority (agent for the State of California Department of Health Services). October 1984.
Sub-series 3.5 United States Environmental Protection Agency, Region IX, and other federal agencies 1983-2006.
Sub-series Scope and Content Summary
United States Environmental Protection Agency. Region IX.:
"Electromagnetic Conductivity Survey." Prepared by Ecology and Environment, Inc. for the United States Environmental Protection Agency Region IX. August 26, 1983.
Final Fast-Track Remedial Investigation Feasibility Study. Prepared by Ecology and Environment, Inc. (the Remedial Planning/Field Investigation Team) for the United States Environmental Protection Agency Region IX. April 9, 1984.
Final Fast-Track Remedial Investigation Feasibility Study. Prepared by Ecology and Environment, Inc. (the Remedial Planning/Field Investigation Team) for the United States Environmental Protection Agency Region IX. May 18, 1984.
Final Stringfellow Summary Report. Prepared by Ecology and Environment, Inc. (the Remedial Planning/Field Investigation Team) for the United States Environmental Protection Agency Region IX. July 13, 1984.
Draft Report: Pilot Testing of Mid-Canyon Interceptor Well Field (two copies). Prepared by Ecology and Environment, Inc. (CH2M Hill) for the United States Environmental Protection Agency. August 10, 1984.
Draft Report: Treatability Testing Program. Prepared by Ecology and Environment, Inc. (the Remedial Planning/Field Investigation Team) for the United States Environmental Protection Agency Region IX. August 10, 1984.
Performance of Remedial Response Activities at Uncontrolled Hazardous Waste Sites (REM II): Work Plan for Operations and Maintenance of the Pretreatment Plant . Prepared by the United States Environmental Protection Agency Region IX. August 29, 1985.
Interim Health and Safety Plan for Pretreatment Plant Operations and Maintenance. Prepared by the United States Environmental Protection Agency Region IX. September 6, 1985.
Pretreatment Plant Sampling and Analysis Plan. Prepared by the United States Environmental Protection Agency Region IX. September 6, 1985.
Pretreatment Plant Operations and Maintenance Plan. Prepared by the United States Environmental Protection Agency Region IX. September 9, 1985.
"Toxicity Testing of Chlorobenzene Sulfonic Acid." Study by the United States Environmental Protection Agency. 1986.
Community Relations Plan. Prepared by Ecology and Environment, Inc. (CH2M Hill) for the United States Environmental Protection Agency Hazardous Site Control Division. Part of the program Remedial Planning Activities at Selected Uncontrolled Hazardous Waste Sites - Zone II. November 1986.
Stringfellow Acid Pits Superfund Site September 1990 Rercord of Decision: Administrative Record Index. Prepared by the United States Environmental Protection Agency Region IX. September 1990.
Stringfellow Superfund Site: Final ROD Administrative Record Index. Prepared by the United States Environmental Protection Agency Region IX. October 8, 1996.
5-Year Review Report for Stringfellow Hazardous Waste Site. Prepared by CH2M Hill, Inc. for the U.S. Environmental Protection Agency, Region IX. September 2001.
Third Five-Year Review Report for Stringfellow Superfund Site. Prepared by CH2M Hill, Inc., URS Group, Inc., and E2 Consulting Engineers, Inc. for the U.S. Environmental Protection Agency, Region IX (two copies). September 2006.
"3rd-5-Year Review Report: Stringfellow Superfund Site" (CD). September 2006.
United States Congress:
"Engineering Case Study of the Stringfellow Superfund Site." Prepared by G.J. Trezek, Department of Mechanical Engineering, University of California, Berkeley, for Office of Technology Assessment, Congress of the United States. August 1984.
U.S. Geological Survey:
"Characterization of Dissolved Organic Solutes in Wastewaters and Groundwaters at the Stringfellow Hazardous Waste Disposal Site: Final Report." By Jerry A. Leenheer, U.S. Geological Survey. circa 1999.